Network access rates

The network access rates are the tolls to be charged to distributors to use their network. Within the network acces rates are also include other costs that are not strictly costs of using distribution network, these costs are:

  • Costs related to Nuclear Moratorium
  • Costs related to pay the extra feed in tariff of the Renewable Energies

Here are listed the network acces rates that a consumer could be connected. The selection of the network access rate must be done through the level of voltage and the power contracted.


NETWORK ACCESS RATES AVAILABLE ACCORDING TO THE VOLTAGE LEVEL AND POWER CONTRACTED

TARIFA 2.0A 2.0DHA 2.0DHS 2.1A 2.1DHA 2.1DHS 3.0A 3.1A 6.1A 6.1B 6.2 6.3 6.4 6.5
TENSIÓN < 1 kV < 1 kV < 1 kV < 1 kV < 1 kV < 1 kV < 1 kV >= 1 kV y
< 36 kV
>= 1 kV y
< 30 kV
>= 30 kV y
< 36 kV
>= 36kV y
< 72 kV
>= 72,5 y
< 145 kV
>=145 Conexiones
internacionales
POTENCIA <=10 <=10 <=10 >10kW y
<=15kW
>10kW y
<=15kW
>10kW y
<=15kW
Sin Restricción <=450 kW > 450 kW > 450 kW Sin
Restricción
Sin
Restricción
Sin
Restricción
Sin
Restricción
PERIODOS 1 2 3 1 2 3 3 3 6 6 6 6 6 6

The following tables list the prices set by the Government for network access rates as low voltage and high voltage.


NETWORK ACCESS RATES IN LOW VOLTAGE- WITH 2 AND 3 TIME PERIODS DISCRIMINATION



TARIFA Fecha Inicio IET   PERIODO 1 PERIODO 2 PERIODO 3

2.0A 1/1/2015 TP [€/kW año] 38.0434260 0.0000000 0.0000000
TE [€/kWh] 0.0440270 0.0000000 0.0000000
Pago por Capacidad [€/kWh] 0.0046300 0.0000000 0.0000000
Pérdidas hasta B.C. [%] 17.48 0.00 0.00

2.0DHA 1/1/2015 TP [€/kW año] 38.0434260 0.0000000 0.0000000
TE [€/kWh] 0.0620120 0.0022150 0.0000000
Pago por Capacidad [€/kWh] 0.0047710 0.0008050 0.0000000
Pérdidas hasta B.C. [%] 16.54 14.36 0.00

2.0DHS 1/1/2015 TP [€/kW año] 38.0434260 0.0000000 0.0000000
TE [€/kWh] 0.0620120 0.0028790 0.0008860
Pago por Capacidad [€/kWh] 0.0047710 0.0010870 0.0006440
Pérdidas hasta B.C. [%] 16.69 17.37 12.95

2.1A 1/1/2015 TP [€/kW año] 44.4447100 0.0000000 0.0000000
TE [€/kWh] 0.0573600 0.0000000 0.0000000
Pago por Capacidad [€/kWh] 0.0046300 0.0000000 0.0000000
Pérdidas hasta B.C. [%] 17.48 0.00 0.00

2.1DHA 1/1/2015 TP [€/kW año] 44.4447100 0.0000000 0.0000000
TE [€/kWh] 0.0745680 0.0131920 0.0000000
Pago por Capacidad [€/kWh] 0.0047710 0.0008050 0.0000000
Pérdidas hasta B.C. [%] 16.54 14.36 0.00

2.1DHS 1/1/2015 TP [€/kW año] 44.4447100 0.0000000 0.0000000
TE [€/kWh] 0.0745680 0.0178090 0.0065960
Pago por Capacidad [€/kWh] 0.0047710 0.0010870 0.0006440
Pérdidas hasta B.C. [%] 16.69 17.37 12.95

3.0A 1/1/2015 TP [€/kW año] 40.7288850 24.4373300 16.2915550
TE [€/kWh] 0.0187620 0.0125750 0.0046700
Pago por Capacidad [€/kWh] 0.0083740 0.0043040 0.0000580
Pérdidas hasta B.C. [%] 16.69 16.67 15.89


NETWORK ACCESS RATES IN HIGH VOLTAGE- WITH 3 TIME PERIODS DISCRIMINATION



TARIFA Fecha Inicio IET   PERIODO 1 PERIODO 2 PERIODO 3

3.1A 1/1/2015 TP [€/kW año] 59.1734680 36.4906890 8.3677310
TE [€/kWh] 0.0143350 0.0127540 0.0078216
Pago por Capacidad [€/kWh] 0.0064320 0.0034630 0.0000000
Pérdidas hasta B.C. [%] 6.91 7.19 6.84



NETWORK ACCESS REATES IN HIGH VOLTAGE- WITH 6 TIME PERIODS DISCRIMINATION



TARIFA Fecha Inicio IET   PERIODO 1 PERIODO 2 PERIODO 3 PERIODO 4 PERIODO 5 PERIODO 6

6.1A 1/1/2015 TP [€/kW año] 39.1394270 19.5866540 14.3341780 14.3341780 14.3341780 6.5401770
TE [€/kWh] 0.0266740 0.0199210 0.0106150 0.0052830 0.0034110 0.0021415
Pago por Capacidad [€/kWh] 0.0064320 0.0029690 0.0019790 0.0014840 0.0014840 0.0000000
Pérdidas hasta B.C. [%] 7.02 7.61 6.88 7.00 6.38 7.46

6.2 1/1/2015 TP [€/kW año] 22.1583480 11.0887630 8.1151340 8.1151340 8.1151340 3.7026490
TE [€/kWh] 0.0155870 0.0116410 0.0062040 0.0030870 0.0019930 0.0012496
Pago por Capacidad [€/kWh] 0.0064320 0.0029690 0.0019790 0.0014840 0.0014840 0.0000000
Pérdidas hasta B.C. [%] 5.06 5.42 4.87 4.89 4.45 5.25

6.3 1/1/2015 TP [€/kW año] 18.9161980 9.4662860 6.9277500 6.9277500 6.9277500 3.1608870
TE [€/kWh] 0.0150480 0.0112370 0.0059870 0.0029790 0.0019240 0.0012085
Pago por Capacidad [€/kWh] 0.0064320 0.0029690 0.0019790 0.0014840 0.0014840 0.0000000
Pérdidas hasta B.C. [%] 3.51 3.80 3.39 3.45 3.14 3.73

6.4 1/1/2015 TP [€/kW año] 13.7062850 6.8590770 5.0197070 5.0197070 5.0197070 2.2903150
TE [€/kWh] 0.0084650 0.0070220 0.0040250 0.0022850 0.0014750 0.0010196
Pago por Capacidad [€/kWh] 0.0064320 0.0029690 0.0019790 0.0014840 0.0014840 0.0000000
Pérdidas hasta B.C. [%] 1.86 1.96 1.80 1.89 1.72 1.93


Supplement for reactive power



VALOR COSENO(PHI) VALOR [€/kVArh]